So, here is a preliminary parst/labor list. Blueprinted and balanced, 4340H-beam rods forged pistons. Master gasket set. New timing belt. Timing idler set, all 4 timing idlers. Timing belt tensioner. Resufrace heads, machine valve and valve seat surfaces. Set lash. Engine removal, disassemble, clean, assembly and install. All fluids. Spark plugs. modified oil pump. New Oem clutch if needed. IAT sensor kit. Perrin turbo inlet. Cobb AP. Killer Bee oil pickup. Might of forgot a few things, but i think thats pretty much it. Added cam gears, as stock ones were chipped. Not quite sure how that happened.